Brickland MRT station
Brickland
NS3A
红砖
பிரிக்லேன்ட் | |||||||||||
|---|---|---|---|---|---|---|---|---|---|---|---|
![]() Future site of Brickland station, located at where the train is | |||||||||||
| General information | |||||||||||
| Coordinates | 1°22′07″N 103°44′58″E / 1.3685°N 103.7494°E | ||||||||||
| System | Future Mass Rapid Transit (MRT) station | ||||||||||
| Owned by | Land Transport Authority | ||||||||||
| Operated by | SMRT Trains Ltd (SMRT Corporation) | ||||||||||
| Line | |||||||||||
| Platforms | 2 (2 side platforms) | ||||||||||
| Construction | |||||||||||
| Structure type | Elevated | ||||||||||
| Accessible | Yes | ||||||||||
| History | |||||||||||
| Opening | 2034 | ||||||||||
| Electrified | Yes | ||||||||||
| Services | |||||||||||
| |||||||||||
| |||||||||||
Brickland MRT station is a future Mass Rapid Transit (MRT) station on the North–South Line located in Singapore. It will serve Choa Chu Kang Neighbourhood 8 as well as Pavilion Park and Tengah Brickland District.[1]
History
Planning

Brickland station was first announced on 25 May 2019 as part of the Land Transport Authority's (LTA) Land Transport Master Plan 2040.[2] The station was planned to serve approximately 13,000 existing households from Keat Hong, Bukit Batok West, Pavilion Park, Tengah town’s Brickland district, and future residential developments.[3] Officially confirmed on 28 July 2023, the station was initially targeted to begin construction in 2024, with a completion date of 2034. Construction works for the station will include a new viaduct and crossover tracks.[4][5]
Construction
On 30 December 2025, the contract for the design and construction of Brickland MRT station and associated viaducts was awarded to Obayashi Corporation for S$281 million.[6] Construction is slated to begin in the first half of 2026.[7] The station construction can only take place during maintenance hours at night.[8]
Details

Serving the North–South Line (NSL), Brickland station will be between Bukit Gombak and Choa Chu Kang stations. The official station code will be NS3A.[9] The station will be constructed along Bukit Batok West Avenue 5 near the junction with Bukit Batok Road.[10]
References
- ^ Toh, Ting Wei (25 May 2019). "Two new MRT stations for North–South Line by mid-2030s; potential new rail line being studied as part of Land Transport Master Plan". The Straits Times.
- ^ "Land Transport Master Plan 2040: Bringing Singapore Together". LTA. 2 May 2019. Retrieved 26 May 2019.
- ^ "Written Reply to Parliamentary Question on Considerations in Siting Proposed Brickland MRT Station at Current Planned Location". Ministry of Transport (MOT). 4 October 2023. Retrieved 5 October 2023.
- ^ "Construction on new Brickland MRT station along North–South Line to start in 2024". CNA. 28 July 2023. Retrieved 28 July 2023.
- ^ "New Brickland Station to Enhance Rail Connectivity in Western Singapore". LTA. 28 July 2023. Retrieved 28 July 2023.
- ^ "LTA Awards Civil Contract for Design and Construction of NS3A Station and Viaduct on Existing North-South Line". Land Transport Authority. 30 December 2025. Retrieved 30 December 2025.
- ^ Hamzah, Aqil (30 December 2025). "Construction of Brickland MRT station on North-South Line to start in first half of 2026". The Straits Times. Retrieved 30 December 2025.
- ^ Kok, Yufeng (28 July 2023). "New Brickland MRT stop between Choa Chu Kang and Bukit Gombak set to open in 2034". The Straits Times. Retrieved 28 July 2023.
- ^ "Annex C: System Map including Brickland Station" (PDF). Land Transport Authority. Retrieved 28 July 2023.
- ^ "Annex A: Location Map of Brickland Station" (PDF). Land Transport Authority. Retrieved 28 July 2023.