Xiecun station (Chinese: 谢村站; pinyin: Xiècūn zhàn) is a station of Line 7 of the Guangzhou Metro. It started operations on 28 December 2016.[1]
Xiecun station has 3 points of entry/exit, with Exit A being accessible via elevator. Exits A and B opened when the station opened and Exit C opened on 8 September 2017.
22°59′26″N 113°17′45″E / 22.990579°N 113.295832°E / 22.990579; 113.295832